Plant Shifting Services Across India
Get In Touch
Request a Quote
Why Trust Bharat Industrial Machinery Movers?
Technical Assessment:
Our engineers inspect the site before relocation. They check machine dimensions and floor capacity. They also assess overhead clearances and access routes.
Experienced Teams:
Multi-disciplinary crews coordinate each relocation activity. Engineers and riggers supervise critical movement operations.
Specialized Handling:
We use different tools like hydraulic gantries and jacks to move in restricted areas.
Plant Reinstallation:
Technicians position and level each machine at the destination. Engineers verify alignment before equipment testing.
Controlled Execution:
Teams conduct risk assessments before major relocation activities. This helps control equipment and site-related risks.
Pan-India Support:
Our plant machinery shifting operations cover industrial locations across India.
Our End-to-End Plant Relocation Process
1. Site Assessment & Machinery Relocation Planning
Our engineers survey both the existing and destination plant before dismantling begins.
- Equipment Assessment: Our team first inspects each machine before decommissioning. They consider machine condition, weight, and other factors.
- Floor Assessment: Teams check floor capacity along planned movement routes. This helps determine suitable handling methods.
- Clearance Checks: Engineers inspect overhead spaces and entry points. They also check narrow aisles and restricted access areas.
- Lift Planning: Teams calculate equipment weight and center of gravity. This helps select suitable lifting equipment.
- Route Planning: Engineers establish safe internal movement paths. They also identify suitable loading and unloading areas.
- Destination Readiness: Teams inspect foundations and installation areas. They also verify available clearances and utility connections.
- Shutdown Support: Teams schedule the relocation during your planned production shutdown. This helps coordinate production stoppage with relocation activities.
2. Plant Decommissioning & Machinery Dismantling
We provide plant decommissioning services to prepare equipment for safe removal.
- Equipment Preparation: Teams stop production before dismantling begins. They also remove remaining process materials from the equipment.
- Utility Disconnection: Technicians disconnect electrical connections before dismantling. They also isolate compressed air, gas, and other utilities.
- Lockout-Tagout: Our team shuts off all energy sources before dismantling. This helps prevent accidental equipment startup.
- Pre-Move Documentation: Teams photograph machine condition before dismantling. They also record connections and existing configurations.
- Component Identification: Teams label machine parts before dismantling. This helps technicians identify each part during reinstallation.
- Match-Marking: Technicians mark mating parts before dismantling. They also record important alignment references.
- Controlled Dismantling: Crews remove assemblies and attachments according to relocation requirements. They follow the planned dismantling sequence.
- Component Protection: Teams protect sensitive controls and precision components. This reduces the risk of damage during handling.
3. Rigging & Heavy Equipment Extraction
- Hydraulic Lifting: We use hydraulic gantries and jacks to help lift heavy machines. Low-height cylinders help create lifting space in restricted areas.
- Toe Jacking: Heavy-duty toe jacks lift equipment from accessible lower edges. Teams raise the machine in controlled stages.
- Rigging: Riggers secure machinery with suitable lifting equipment. This keeps the equipment stable during lifting and movement.
- Spreader Bars: Teams use spreader bars during suitable lifting operations. They help distribute lifting forces across the equipment.
- Machine Skidding: Teams use skidding systems to move heavy machinery across the plant floor.
- Directional Movement: Precision turntables help maneuver equipment through restricted areas. They also support controlled movement around tight corners.
- Tight-Access Extraction: Crews move equipment through restricted entrances and internal routes. Teams select handling methods based on available clearance.
4. Machinery Loading, Transportation & Unloading
- Machine Loading and Unloading: Teams load equipment using suitable lifting systems. They follow the planned loading sequence during each operation.
- Load Securing: Crews secure machinery to prevent movement during road transport. They use suitable tie-down arrangements for the equipment.
- Heavy-Haul Transport: Suitable trailers carry heavy and oversized equipment between facilities. Trailer selection depends on equipment weight and dimensions.
- Route Planning: Teams survey the transport route before movement. They check road height and width restrictions. They also assess bridge limits and turning space. This helps identify potential transport constraints before dispatch.
- Industrial Equipment Transportation: Crews coordinate the movement of heavy and oversized equipment. They manage the planned transport sequence between facilities.
- Machinery Packing: Teams protect sensitive parts during transportation. Protection can include moisture, vibration, dust, impact, and weather protection.
- Controlled Unloading: Crews unload equipment using the planned lifting sequence. They then position it for installation.
5. Precision Plant Installation & Reinstallation
We provide plant installation services to restore equipment at the destination plant.
- Positioning: Technicians place machines according to the approved plant layout. They verify the planned machine location before final fixing.
- Foundation Placement: Teams position equipment on prepared foundations. They install anchor bolts where required.
- Leveling: Technicians level each machine according to installation requirements. Correct leveling supports stable machine operation.
- Alignment Verification: Engineers compare final positioning with recorded alignment references. They use optical or laser alignment methods where required.
- Mechanical Adjustment: Technicians make required mechanical adjustments after positioning. This helps achieve the required installation condition.
- Utility Reconnection: Technicians reconnect electrical and utility systems. They follow applicable manufacturer requirements during reconnection.
6. Utility Reconnection & Plant Commissioning
We provide plant commissioning services after equipment installation. Our team tests and verifies machinery after utility connections.
- Utility Reconnection: Technicians reconnect required power and utility systems. They verify connections before equipment startup.
- Pre-Start Checks: Teams inspect machine condition before starting. They verify installation and safety requirements.
- Alignment Verification: Engineers complete final alignment checks where required. They compare results with recorded reference conditions.
- No-Load Trials: Technicians operate equipment without production load. This helps identify issues before production testing.
- Full-Load Trials: Teams test equipment under operating conditions. They check performance during the planned production trial.
- Commissioning Support: Engineers support final equipment testing and production readiness. They coordinate required adjustments during commissioning.
Industries We Support
| Industry / Service | Typical Equipment / Scope |
| Metalworking | CNC Machine Shifting |
| Plastic Manufacturing | Injection Molding Machine Shifting |
| Textile | Textile Machinery Shifting |
| Packaging | Packaging Machinery Shifting |
| Food Processing | Food Processing Machinery Shifting |
| Pharmaceutical | Pharmaceutical Machinery Shifting |
| Automation | Industrial Robot Relocation |
| And other machinery services |
Safety During Plant Shifting
- Load Assessment: Our teams assess equipment weight before selecting lifting methods.
- Rigging Assessment: Riggers select suitable lifting equipment and connection points.
- Route Assessment: Engineers check internal routes before moving equipment.
- Equipment Inspection: Teams inspect lifting and handling equipment before use.
- Job Safety Analysis: Teams identify activity-specific risks before starting major work.
- Load Protection: Crews protect equipment during lifting and transportation.
- Site Coordination: Teams coordinate relocation activities with plant personnel and other contractors.
Ready for Plant Moving Across India?
Successful plant shifting starts with proper planning. Bharat Industrial Machinery Movers checks your equipment and site before the move. Our team plans each activity and manages the relocation sequence. We handle the work from decommissioning through final commissioning.
We provide reliable Industrial Relocation Services across India. Contact Bharat Industrial Machinery Movers to discuss your plant shifting requirements.
Frequently Asked Questions
Yes. We do pre-start checks and alignment verification. Our technicians then conduct no-load trials. We follow these trials with full-load testing before production restarts.
We disconnect the required utilities before dismantling. Our teams label machine components for reinstallation. We also document existing configurations before removing equipment.
We maintain equipment records and photographs throughout the relocation. Our teams also document dismantling details. We keep installation references for the reinstallation stage.